Nasty accident. At least 30 dead and hundreds injured.
The rollout is being done too fast. Quantity is not enough if the quality is allowed to slip. There is too much pressure to build too much too fast. A lot of important engineering is not visible or obvious at all.
http://ibnlive.in.com/news/crash-may.../169929-2.html
The rollout is being done too fast. Quantity is not enough if the quality is allowed to slip. There is too much pressure to build too much too fast. A lot of important engineering is not visible or obvious at all.